Welcome to the relevant industries to call us, we will work together with you in good faith, common development! We sincerely welcome new and old friends to call us for guidance!
Our hand in hand, will be for your product to bring the deduction.
Recently, the weather in Guangdong is hot, and the two-wheeled electric vehicles frequently "catch fire".
According to the statistics of the fire department of the Ministry of Emergency Management, there are about 2,000 electric bicycle fires in China every year. In 2020, 421 electric vehicle fires will occur in Shanghai, killing 20 people and injuring 19, and centralized charging has become the main way to solve the safety of electric two-wheeler batteries.
As of the morning of July 13, a total of 199 electric vehicle fires have occurred in Guangzhou this year, and the cause of fire is 136 battery failures, accounting for 68.34% of second-round electric vehicle fires.
There are four hidden dangers in the charging process of traditional two-wheeled electric vehicles:
1. Life anxiety: the average 1.5-2 years need to replace the battery
2. Safety anxiety: charging more than 12 hours can easily lead to short circuit of the battery and spark
3. Site anxiety: need to fix the socket, one charge, can not fly line charging
4. Waiting anxiety: 6-8 hours in summer, 8-10 hours in winter
In order to perfectly resolve the charging risk and solve the replenishment problem, it is necessary to upgrade the traditional replenishment site into an intelligent power change cabinet with the help of advanced technologies such as mobile Internet, cloud computing, big data, and the Internet of Things.
Comprehensively build ecological chain work such as battery research and development, power change cabinet application, battery echelon utilization, waste battery recycling analysis, and battery regeneration, reshape the underlying logic of smart travel, deeply empower transportation infrastructure, and bring about comprehensive improvement of accurate perception, accurate analysis, fine management, and careful service capabilities.
Therefore, "to replace" mode officially entered people's lives.
Giant power change · Intelligent power change cabinet
The intelligent power exchange is a mode of rapid replenment by placing the battery in the integrated cabinet and replacing it with a fully charged battery on the spot, transforming the user's decentralized and autonomous charging behavior into a new scene and lifestyle, while meeting the user's needs for affordable, safe and quality travel.
The giant power change cabinet can perfectly solve the "four hidden dangers" of traditional energy replenishment and achieve a safe, convenient and high-energy user travel experience.
1. High energy sustainable: there are 40 amp hours of new batteries for each power change
2. Replenishment safety: The intelligent power change cabinet monitors the battery in real time
3. Convenient power change: more than 200 power change cabinets, just change the power along the way
4. No need to wait: 10 seconds to complete the power change, unlimited battery life
The use of solid state battery series products, is the first use of solid state battery brand in the current power change products, can better in the premise of no modification, no charging, absolute safety, to achieve the "efficient power change, unlimited battery life" smart travel vision.
Last: None
Next: Giant power change: the best investment project in 2023 - shared power change cabinet |
Return |
Recommended news
On June 18, 2021, LG New Energy Asia Marketing General Manager revealed at the 2021 China Automotive Forum that LG New Energy is de…
Two-wheeled electric vehicles are a means of transportation in many Peoples Daily lives, but accidents are also common in the proce…